OTEC DAILY / PROJECT UPDATES
Bifolding Door Installation in Quezon City | OTEC
OTEC International Trade Corporation carried out bifolding door installation work at U.P. Diliman in Quezon City, with four door assemblies included in the project.
The October 30, 2026 update records a necessary adjustment to one oversized door, alongside an outstanding hardware component requiring replacement.
U.P. Diliman
Quezon City, Metro Manila, Philippines
INSTALLATION UPDATE | U.P. DILIMAN, QUEZON CITY
Project Overview
Bifolding Door Installation in Quezon City
On October 30, 2026, the team reported bifolding door installation in Quezon City for a project at U.P. Diliman under client Engr. Norwin.
The installation scope comprised four bifolding doors, originally configured with ten panels each, across the interior openings shown in the project photographs.
One door was found to be oversized for the required opening, prompting the team to adjust its dimensions and remove one panel.
Engr. Glen de Vera inspected the items, while the project update also identified a hardware component that still requires replacement.
Installation Details
Project Highlights
04 DOORS
Bifolding Door Installation
Four bifolding doors were included in the installation scope, each originally specified with ten panels.
01 PANEL
On-Site Door Adjustment
The team adjusted one oversized door's dimensions and removed a single panel to accommodate the required opening.
HARDWARE
Replacement Pending
One hardware component requires replacement, and final installation completion remains unconfirmed in the report.
Project Gallery
A Closer Look at the Installation
The project photographs show work along an upper door frame, handling of a glass door panel, and a close-up of door hardware.




Additional views document installers attending to a wide bifolding door assembly and the overall configuration of the door panels inside the space.
These images record installation activity and visible components but do not independently establish that the outstanding hardware replacement has been completed.
Project Progress
Installation Adjustment and Pending Hardware Replacement
The recorded work includes installation activity for four bifolding doors and the adjustment of one oversized assembly to fit its designated opening.
The hardware replacement remains pending confirmation in the supplied report, and the final completion of the bifolding door installation has not been verified.
The project therefore remains an installation update rather than a completed-project announcement until the remaining hardware issue and final status are confirmed.